noreaster.com
Forum/General Discussion/Do they think we're idiots!

Do they think we're idiots!

58,996 views·738 replies·by george·First Post·Latest
george
georgeADMINnoreaster.com2023#341
That article says a lot.

As ambitious renewable energy projects continue to expand, the environmental impact and the consequences for local towns can no longer be ignored.

One of the most significant issues arising from ocean industrialization is the threat to marine life, particularly the critically endangered Atlantic Right whales, as well as the thousands of whales and dolphins that they have already approved to be killed.

Beyond the direct impact on marine life, the development of ocean-based projects is also transforming the entire fabric of coastal communities. Many unsuspecting towns are finding themselves serving as staging points for the construction and maintenance of offshore energy installations. This sudden shift in the local landscape can lead to a multitude of challenges, including increased noise, pollution, and congestion, along with potential changes to the local economy and job market.

The more we delve into the issue, the more apparent it becomes that the industrialization of our oceans has far-reaching consequences.
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#342


This is just one of the casualties that have silently fallen to the big money of wind. Soon this once popular restaurant, complete with a marina and boat access will soon look like this:



This is actually a very small rendition. This is what I mean by the industrialization of our oceans.
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#344
How many plovers will die?
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#345
Commercial fisherman in the northeast are finding "coexistence" with big wind is not going to be easy.

*** Vineyard Wind is now placing boulders at the sites of the planned 62 turbines and offshore substation.
Initially, they told us only small filter stones 1 to 3 inches but now they are placing boulders at every one of the Turbine sites. We already received a report of a Rhode Island fisherman that was told not to set his gear because the boulder would destroy his net and he would not be able to get his net back up in boat within the area of the lease area known as the “compass rose.”
Say goodbye to some of our best squid and whiting grounds, with zero compensation for New York fishermen from Copenhagen Infrastructure Partnership, (created by one of Denmark’s labor pension funds- Pension Danmark,) and Avangrid.
“Through May 22, the 507' stone placing vessel FLINTSTONE will continue placing Scour Protection stones within the Lease Area at the 62 planned Wind Turbine Generator (WTG) and 1 Electrical Service Platform (ESP) foundation locations.
Placement is done in two phases, first a filter layer of stone is placed, followed by a layer of armor stone. The ongoing operation involves the FLINTSTONE working within the lease area for approximately 4 days and then returning to port to reload stones. It is expected to make 11 trips to port.”
And the prior notice only said 17 locations and filter stone only https://web.archive.org/.../www.../mariners-updates/76
How’s that for sleight of hand…?
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#346

Take' authorizations prove NOAA is lying about whale deaths​


The marine science community knows this much for certain: The high-resolution geophysical (HRG) surveys used to site offshore wind turbines and transmission cabling causes harm and mortality to marine mammals. They know the intense noise of pounding thousands of monopiles deep into the seabed, along with an exponential increase of vessel traffic during construction and for maintenance afterwards will do the same—disturb, injure, and kill marine life.
Here's the proof: As of mid-March 2023, NOAA Fisheries has handed out 15 marine mammal Incidental Take Authorizations (ITAs) to offshore wind projects from NC to MA. These will allow companies to “take” 111,817 whales, dolphins and seals. The harassment, injury, and killing of marine mammals are referred to as “takes.”

The 111,817 figure is the tally of 118 “Level A” and 111,699 “Level B” takes. Level A includes permanent hearing loss and other bodily injury. Level B harassment includes behavioral disturbance (such as frightening an animal from its normal feeding area) and temporary hearing loss. A deafened whale fleeing into a shipping channel is likely a dead whale.
It is illegal to take any federally listed animal, that is, unless one applies for and is granted an ITA. An “incidental” take is defined as, “an unintentional, but not unexpected taking of a protected species.”

NOAA is in the final stages of approving an additional 1,272 Level A and 477,285 Level B takes of marine mammals for another 11 wind projects. Soon the approved ITA count will permit wind companies to disturb, injure or cause the death of 590,374 marine mammals. These figures were compiled by carefully searching 26 individual wind project ITA requests. NOAA either does not have or will not share cumulative take numbers.

The data reveals that NOAA has either granted or is in the final stages of granting Level B takes for 915 critically endangered North Atlantic right whales, of which there are only 334 remaining animals alive. Either this means NOAA and the wind companies expect repeated harassment (including recurrent hearing impairment) of numerous right whales, or they have not taken the trouble to realize they have granted more “takes” than the number of live whales who exist today.

A total of 387 A and 21,704 B takes have been or are close to being approved for whales. These numbers include the taking of five species of endangered whales. For eight dolphin species A takes total 140; B takes total 474,605. A takes total 658 for harbor porpoise; B takes total 24,122 porpoises. A takes total 205 harbor, grey, and harp seals; B takes total 68,553 seals.
The numbers of “not unexpected” harassment and injury of marine mammals are staggering.
NOAA states in its February posting of Sunrise Wind’s ITA request (NOAA-NMFS-2023-0012): “Project activities likely to result in incidental take include pile driving…and vessel-based site assessment surveys using HRG equipment.”
Still NOAA has only one answer to the question being asked by thousands of coastal residents as to whether wind companies’ recent seismic testing might be related to the highly unusual number of whale strandings: NO.
Why are they lying?
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#347
This is astounding. They have literally sanctioned the death of more North Atlantic Right Whales than there actually are in existence!

George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#348


This is an update issued by Vinyard Wind. The industrialization of our once peaceful sea is here to stay.

The more you look the worse it gets

Through May 22, the 507' stone placing vessel FLINTSTONE will continue placing Scour Protection stones within the Lease Area at the 62 planned Wind Turbine Generator (WTG) and 1 Electrical Service Platform (ESP) foundation locations. Placement is done in two phases, first a filter layer of stone is placed, followed by a layer of armor stone. The ongoing operation involves the FLINTSTONE working within the lease area for approximately 4 days and then returning to port to reload stones. It is expected to make 11 trips to port.

All Mariners transiting or fishing in the area are requested to give a wide berth to the vessel as they are limited in their ability to maneuver. Vessels in the vicinity of the stone placing operations are requested to operate in a manner as to not endanger the vessel or associated equipment. Passing arrangement can be made via VHF with the vessels.

Until the areas are marked on the NOAA chart and the wind turbine foundations are installed it is recommended that the area be avoided by any vessels dragging gear on the bottom. There will be no surface marking of the scour protection positions.

During this operation, the F/V FLEET KING or the F/V TORBAY will remain on site “weather permitting” to assist mariners in navigating in vicinity of the operations.
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#349
Coexistence? I don't think so

When bullies don’t get their way…
The Danish energy company Orsted, which plans to build the Ocean Wind project, filed a lawsuit in state Superior Court on May 4 demanding that Ocean City should grant the permits needed for the underground transmission line.
Orsted plans to run a transmission line under the seabed to bring electricity onshore through the beach lots of 35th Street in Ocean City. The line would run through Ocean City and connect to the land-based electric grid at the former B.L. England power plant in Upper Township.

In response to the lawsuit, Ocean City Mayor Jay Gillian issued a statement strongly criticizing Orsted.
“The lawsuit continues a pattern that Ocean Wind presumes the offshore wind project is a done deal and they will resort to any means to maintain their desired schedule,” Gillian said.

Ocean City has appealed a New Jersey Board of Public Utilities ruling that bypasses local review of the proposed transmission line through town, Gillian explained in the statement. The appeal, he said, is made on the basis that this may not be the only or best route, and that other routes were given little consideration.

Ocean City is lashing out at the developer of a proposed offshore wind farm after being hit with a lawsuit in an ongoing dispute over a transmission line needed for the controversial project. The Danish energy company Orsted, which plans to build the Ocean Wind project, filed a lawsuit in state Supe...
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
Roccus7
Roccus7MODnoreaster.com2023#350
As if we didn't know, but know, but now it's patently obvious that even endangered species can be sacrificed to the Gods of Windmills!!! My highlights of portions of the text...

Criminal cases for killing eagles decline as wind turbine dangers grow​

pressherald.com/2023/05/17/criminal-cases-for-killing-eagles-decline-as-wind-turbine-dangers-grow/

By MATTHEW BROWN and CAMILLE FASSETT May 17, 2023


ROLLING HILLS, Wyo. — Criminal cases brought by U.S. wildlife officials for killing or injuring protected eagles dropped sharply in recent years, even as officials ramped up issuing permits that will allow wind energy companies to kill thousands of eagles without legal consequence.

The falloff in enforcement of eagle protection laws accelerated in the Trump administration and has continued under President Biden, according to U.S. Fish and Wildlife Service data obtained by the Associated Press.

It comes amid growing concern that a proliferation of wind turbines to feed the demand for renewable energy is jeopardizing golden eagle populations.

Dozens of permits approved or pending would allow roughly 6,000 eagles to be killed in coming decades, government documents show. More than half the killed birds would be golden eagles, which prefer the same open landscapes as wind developers.

The findings underscore a Biden administration dilemma: Confronting climate change through clean power development requires trade offs such as more dead birds from collisions with wind turbines.

“They are rolling over backwards for wind companies,” said Mike Lockhart a former U.S. Fish and Wildlife Service biologist who researches eagles in Wyoming. “I think they are killing a hell of a lot more eagles than they ever anticipated.”

Turbines can tower 260 feet with blade tips spinning in excess of 150 mph.

Companies often pledge to perform conservation work to offset eagle deaths. Some permits include direct payments for dead eagles — about $30,000 per bird. Numerous permits allow the killing of bald eagles without compensation.


The Biden administration has proposed streamlining the process, making permits automatic in some cases, as they allow wind-energy projects and power line networks to harm eagles and disturb nests.

Some wind farms have relocated turbines or reduced their numbers to minimize deaths. But turbines continue to go up in areas frequented by golden eagles, and Lockhart said the cumulative impacts could be disastrous.

Turbines have killed at least six golden eagles Lockhart had previously trapped and tagged for research. One was killed about two months after a wind farm started operating near its nest in 2021, he said.

“They’re going to more than double the (wind) capacity and in doing that, the impacts on wildlife, particularly golden eagles, are going to be exponentially going up,” Lockhart said.

Fish and Wildlife Service officials said they are working to avoid such a scenario by working with companies to reduce bird deaths. “We expect the final number to be much smaller,” spokesperson Vanessa Kauffman said.

There have been a small number of high-profile prosecutions of wind companies that continued killing eagles despite prior warnings from wildlife officials — including major utilities Duke Energy, PacifiCorp and NextEra Energy. Each company agreed to take steps to limit eagle deaths.

Yet at Duke Energy’s wind farms in Wyoming, eagle deaths became more frequent after the company reached a 2013 deal that included a $1 million fine and shielded it from prosecution for 10 years, according to government and court records. The company says the rate has fallen after it installed a system that shuts down nearby turbines when eagles approach.

The company also was awarded a permit allowing the accidental killing of eagles without penalty, providing it takes steps to minimize them. Wildlife officials approved such permits for more than two dozen major wind projects over the past several years, sometimes with opposition from Native American tribes that revere eagles.

Despite objections from the Colorado River Indian Tribes, officials approved a permit last year for Tucson Electric Power, operator of 62 turbines in southern New Mexico, allowing it to kill 193 golden eagles over 30 years. Federal officials said a permit offered the “only available avenue” to require conservation measures such as minimizing or compensating for eagle deaths.

In Minnesota, Grand Portage Band of Lake Superior Chippewa Chairman Robert Deschampe said with their proposal to further streamline permitting, wildlife officials had “abandoned” protections for eagle nests and ignored tribal concerns.

Several major conservation groups jointly lobbied the White House with Duke energy and other utilities in support of streamlined permitting. Their rationale was that regulating industry through permits was preferable to companies ignoring eagle deaths out of fear of prosecution.

“Part of the issue is that companies have generally not been requesting permits and they’ve been taking their chances and there hasn’t been a lot of law enforcement,” said Steve Holmer, vice president of policy at the American Bird Conservancy.

Violations of the Eagle Protection Act rose during the second term of President Barack Obama, after wind farms proliferated and an AP investigation found dozens of unprosecuted eagle deaths.

At the urging of industry, Trump appointees rolled back enforcement of the Migratory Bird Treaty Act that protects more than a thousand species in addition to eagles.

A Biden order reversed the rollback. However, cases continued sliding and hit their lowest level in a decade in the Democrat’s first year with 49 recorded violations, after peaking at 232 under Obama in 2014. They averaged 67 annually under Trump.

In its 2024 budget request, the service revealed special agents were at historical low levels and that 47 agents will hit mandatory retirement in the next four years.

Only about one in eight cases brought under the Eagle Protection Act from 2012 to early 2022 resulted in fines, probation or jail time, according to AP’s analysis.

Whether criminal charges are pursued is up to prosecutors, said agency spokesperson Christina Meister.
At Duke’s Top of the World wind farm near the town of Rolling Hills, at least 56 eagles have been killed since it started in 2010.

Several years ago, Duke deployed a camera system to detect incoming eagles so turbines in a bird’s path can be shut down. Since the cameras were installed, eagle deaths declined by more than 60%, said company scientist Misti Sporer.

“Today, we would likely not put those wind turbines where they are,” Sporer said.
Shall I go to heaven or a-fishing? - H. D. Thoreau
Veni. Vidi. Cepi. - with apologies to Gaius Julius Caesar
AdmiralOriginal Crew21,717 postsSince 2018
george
georgeADMINnoreaster.com2023#351
The more you see, the worse it gets.
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#352
NJ Dead Dolphin #30

96C41C71-17E1-4302-9631-D85D7C012ADE.webp
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
WhatKnot
WhatKnotFREE2023#353
NJ Dead Dolphin #30

View attachment 63013
Move along, nothing to see here, just happenstance.
Be Safe
CommodoreOriginal Crew12,915 postsSince 2019
george
georgeADMINnoreaster.com2023#354
Move along, nothing to see here, just happenstance.
Exactly.
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#355
A Humpback just washed ashore on Fire Island. I'm looking for a photo.
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#356
BABYLON, N.Y. - A whale washed ashore on Fire Island Friday morning.

According to the New York State Parks Department, the juvenile humpback whale washed ashore at Field 5 of Robert Moses Beach.

The whale is approximately 18-20 feet long

Pretty sad.

08E82C0D-0F87-4935-84CA-04BA57FD8533.webp

The more you look the worse it gets.
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
george
georgeADMINnoreaster.com2023#357
I ask, has anyone recall a time when we have seen this many whale and dolphin mortalities? Ever?

To quote @WhatKnot "Move along, nothing to see here, just happenstance."
George R. Scocca
george@nyangler.com
www.nyangler.com - Your Secret Spot Online !
CommodoreOriginal Crew5,174 postsSince 2018
OVERBORED
Robert Moses Whale Death
"Chance only favors the prepared mind" - Pasteur
Captain4,161 postsSince 2021
longcast
longcastFREE2023#359
Robert Moses Whale Death
Nope
AdmiralOriginal Crew20,417 postsSince 2019
jpd
jpdMODnoreaster.com2023#360
The stunning silence by the usual defenders of the whales has me believing they know exactly what's causing the deaths.
A lawyer with his briefcase can steal more than a hundred men with guns- Mario Puzo
CommodoreOriginal Crew9,876 postsSince 2018

Sign in to reply to this thread.

Thread
Do they think we're idiots!
Sign in